Debt Financing
Underwriting and the closing scramble: where deals slow, shrink, and stall
Closing stalls on the checklist, not the economics. The appraisal can shrink the loan, the estoppels can delay it, and the entity paperwork can stop it, all in the final week.
Between the commitment and the wire, the loan goes through the lender’s checklist, and the checklist is where deals slow, shrink, and occasionally die. Not on the economics, which were settled at the term sheet, but on a stack of third-party reports and documents the lender requires before it will fund: the appraisal, the environmental report, title and survey, the tenant estoppels, and the entity paperwork proving the borrower can sign. The last week before closing is a scramble to satisfy every item at once, and the items that stall it are almost never the interesting ones. They are the certificate that lapsed and the estoppel the tenant did not return.
Closing stalls on the checklist, not the economics. The appraisal can shrink the loan, the estoppels can delay it, and the entity paperwork can stop it, all in the final week.
The lender’s file
Underwriting is the lender building the file that justifies the loan to its own credit committee, its investors, or its regulator. The core items are predictable. An appraisal, ordered by the lender, that sets the value the loan is sized against. A Phase I environmental assessment, and a Phase II if the first one points to a problem, because the environmental indemnity you will sign is the lender’s backstop and the report is its baseline. A title commitment and survey, to confirm the lender’s lien will be where it thinks. Estoppel certificates and subordination agreements from the tenants, because the leases are the collateral. Insurance certificates naming the lender. And the authority package: formation documents, good-standing certificates, borrowing resolutions, and often a legal opinion, proving the entity exists and can borrow.
Each item is a condition to funding. The lender does not close until every one is satisfied, and it judges satisfaction.
The appraisal is the item that changes the deal
Most checklist items either pass or delay. The appraisal can resize the loan. It is the lender’s number, ordered by the lender, and when it comes in below what the term sheet assumed, the loan-to-value math shrinks the proceeds mechanically: the same percentage applied to a lower value is a smaller loan. A borrower who committed to a purchase price on the strength of a term sheet’s loan amount can find, weeks before closing, that the lender will fund less and the difference is equity they have to produce. This is the retrade in its most common form, and it arrives at the stage when the borrower has a deposit at risk, an exclusivity period running, and a seller expecting to close.
The scramble, and why it is filings work
The final week is administrative, and the administrative items are the ones that stall funding. A tenant estoppel that comes back with a claimed landlord default. A good-standing certificate that reveals the entity’s annual report lapsed. An operating agreement on file that does not clearly authorize the manager to borrow. A resolution signed by someone the documents do not empower. A required certificate that has to come from a state office on the state’s schedule. None of this touches the deal’s merits, and all of it can hold up a wire. The authority package page covers what has to be right; the lifecycle point is that this is the stage where a borrower who keeps the entity current year-round closes on time and a borrower who does not spends the last days reinstating a company and redrafting consents.
What to do at this stage
Order and manage what you can control early: the estoppels, the insurance, the entity documents. Assume the appraisal is a variable, and know before you commit to a price what happens to your equity if it comes in ten percent low. Read every condition precedent in the commitment as an item on a checklist you will be racing at the end. And separate the work into the part that needs judgment and the part that needs precision on a deadline, because the second part is where closings slip, and it is the part that a clean, current entity makes trivial and a neglected one makes a crisis.